Parkview Health System
Fort Wayne, Indiana
|
Satellite Facility
|
|
Design-Build Contract: $19,317,730
New Square Feet: 114,200
Completion Date: December, 2001
Above includes: Architecture and Engineering Services, Construction including Site Work.
New three-level satellite hospital with 24 medical/surgical beds and 14 obstetrics beds for a total bed complement of 38 beds. The obstetrics unit includes a nursery and eight LDR's. The surgery unit provides four operating rooms, a special procedure room, recovery room and prep/hold beds. An emergency department with 10 treatment spaces, four holding beds and imaging with two x-ray rooms, CT scan, ultrasound, nuclear medicine and a special procedures room, as well as a laboratory, dietary, pharmacy, admitting, administration, medical records and other support areas as required. The bed tower is structured for two future floors.
|
|
Orthopedic Hospital
|
|
Design-Build Contract: $9,888,950
New Square Feet: 65,400
Completion Date: June, 2002
Above includes: Architecture and Engineering Services, Construction including Site Work.
A two-story orthopedic hospital attached to the main hospital includes shelled space for an orthopedic clinic, four operating rooms, nine-position recovery, nine-position prep/hold, central sterile, locker rooms, lounge, business office and a waiting room, all on the first floor. The second floor houses a 24-bed surgical unit, inpatient physical therapy and a conference/classroom. A corridor connects this bed unit to the Parkway North Hospital second floor bed unit.
|
| |
|
Parkview Hospital was faced with an initial design that exceeded a $30 Million design and construction budget for its new satellite facility, Parkview North Hospital. Parkview asked for an HBE "Second Opinion" through the Comparative Analysis Program. |
|