Home arrow Library arrow News arrow Lawrence & Memorial Hospital
Lawrence & Memorial Hospital
new_london_ct-projectprofiles1.jpg











 

Lawrence & Memorial Hospital
New London, Connecticut


Ambulatory Care Center/Parking Structure
Contract Amount:
$7,978,012*
New Square Feet:
51,200
Completion Date:
July 1990
*Includes all architectural, engineering, construction and site work.

                    
  The project includes a two-story amublatory care center and a 340-car parking structure.

1st Floor

Ambulatory Care Center - includes a lobby, new 50-seat auditorium, clinic and a new pre-admitting testing department with laboratory, radiology and ultrasound capability.

2nd Floor
Shelled for doctors offices.

3rd Floor

Four OR ambulatory surgery units with a three-room endoscopy suite.


"It truly is remarkable...how the new construction and the renovations have come together. It is also a testimony to your (HBE's) expertise in how well we were able to realign different departments to increase the efficiency of the whole operation geometrically. Of particular note, is how the new emergency room, operating rooms, post anesthesia recovery and the new critical care unit have blended so well horizontally with diagnostic imaging and vertically with the major inpatient care units. It is a project that we are very proud of and I hope that you and all the members of your staff view it as a significant accomplishment."
William T. Christopher,
President Lawrence & Memorial Hospital New London, Connecticut
     

Pharmacy   Lawrence & Memorial Hospital
New London, Connecticut

Contract Amount: $498,351*
New Square Feet:
7,640
Completion Date:
February 1990
*Includes all architectural, engineering and construction costs

The existing general stores were converted into a new pharmacy department which was completed in conjunction with the ambulatory care center and parking structure project.

Excavation/Site Utility
  Contract Amount: $468,000*
Completion Date: December 1997
*Includes all architectural, engineering and construction costs

Excavation and site utility relocation for the new 6-story “G” building and relocation of a portion of the Ambulatory Care Center entry drive.

New Construction
  Contract Amount: $32,955,903*
New Square Feet: 164,000
Completion Date: October 1996
*Includes all architectural, engineering and construction costs

New 6-story “G” building includes the new Cancer Treatment Center, linear accelerator, central supply, emergency department, 31-bed orthopedic unit, 31-bed pulmonary unit and a 31-bed oncology unit. New 5-story “H” building and renovation of the existing “E” building includes a new main lobby, admitting, business office, gift shop, chapel, education and medical records.

Renovation  

Contract Amount: $1,065,000*
Completion Date: October 1996
*Includes all architectural, engineering and construction costs

Renovation of the existing kitchen to accommodate a totally new food service preparation process.

 
< Prev